Net-Metering request checklist

All residential, commercial or industrial buildings that are interconnected with the EAC network have the right to apply to EAC for the purpose of installing a photovoltaic system using the NET-METERING method, given they have been legally built according to the regulations of the Department of Town Planning and Housing. Upon submission of the application to the EAC, the applicant pays the amount of €250 plus VAT, which is the cost of managing the application, the meter, the check and the interconnection with the network.

Step 1 of 6

Net-Metering request checklist

All residential, commercial or industrial buildings that are interconnected with the EAC network have the right to apply to EAC for the purpose of installing a photovoltaic system using the NET-METERING method, given they have been legally built according to the regulations of the Department of Town Planning and Housing. Upon submission of the application to the EAC, the applicant pays the amount of €250 plus VAT, which is the cost of managing the application, the meter, the check and the interconnection with the network.